NCHISF, PWD inspect critical stretches of Haflong bypass; contractor to resume work Monday
Haflong May 17: Following concerns raised by the North Cachar Hills Integrated Social Forum (NCHISF), a joint inspection of the PGHJ Haflong Bypass Road (Mahadevtilla to Lower Haflong) was carried out today by the NCHISF team and officials from the PWD Roads, Haflong Division.
During the site visit, the delegation identified several critical sections of the road requiring urgent attention, including locations where box culverts, cement concrete (CC) walls and improved drainage systems are needed to ensure safe and durable construction. Officials said these measures are necessary to address erosion, waterlogging and structural weaknesses that threaten public safety and road longevity.
PWD sources said the contractor will resume construction work from Monday. Authorities also confirmed that the road will be laid using Interlocking Concrete Block Pavement (ICBP), a method expected to improve surface durability and drainage.
NCHISF representatives welcomed the PWD response and said they will continue monitoring progress to ensure timely completion and adherence to safety standards.
No comments